logo
products
Home / Products / Water Treatment Equipment /

Upgrade Your Sewage Treatment System with Bubble Technology s Advanced Water Treatment Equipment

Upgrade Your Sewage Treatment System with Bubble Technology s Advanced Water Treatment Equipment

Brand Name: EVEREST
Model Number: WPJ-5000
MOQ: Negotiable
Price: Negotiable
Payment Terms: L/C, D/A, D/P, T/T
Supply Ability: 800 units/year
Detail Information
Place of Origin:
China
Certification:
lS09001,IS014001, ISO45001, (TS ) Grade A, PED2014/68/EU,AP1 5LC, API 5LD, ASME, CCS, LR, DNV , BVRINA and ABS.
Product:
Upgrade Your Sewage Treatment System With Bubble Technology S Advanced Water Treatment Equipment
Application Field:
Phosphorus Removal In The Steel Industry,Removal Of Impurities From Tanning Wastewater,etc.
Model:
WPJ-5000
Configuration(L/h):
5000
Effective Box Body (L):
6000
Material Dispenser(KW):
0.55
Mixer:
0.75×3
Maturation Time(min):
50
Length:
4.4
Width:
1.7
Height:
2.05
Water Inlet:
40
Water Outlet:
40
Vent:
40
Packaging Details:
according to customers' demand
Supply Ability:
800 units/year
Highlight:

sewage water treatment equipment

,

sewage air flotation water treatment

,

bubble water treatment equipment

Product Description

Upgrade Your Sewage Treatment System with Bubble Technology s Advanced Water Treatment Equipment


Product Overview:

With the continuous improvement of the national effluent standard, the removal of TP and SS has become the top priority of the upgrading work. In recent years, Bubble Technology has been exploring in the field of sewage upgrading and transformation and optimizing operation, and has successively developed a series of advanced treatment products such as continuous quicksand filtration, rotary plate filtration, deep bed filter, precision filtration, etc., the system realizes rapid coagulation and precipitation by adding magnetic powder medium, which has the advantages of good effluent effect and low operating cost, and can greatly reduce the amount of chemical dosage and energy consumption, and the effluent can reach SS<5mq/L, TP<0.3mq/, and meet the discharge standard of Class A or higher.


Working principle:

High-efficiency magnetic coagulation sedimentation system is in the process of conventional coagulation and flocculation, adding water treatment supporting magnetic powder, powdery magnetic powder combined with floc in the coagulation process to form a stable floc with magnetic powder as the condensation nucleus, because the specific gravity of magnetic powder is 5.3 times the specific gravity of water, the specific gravity of the floc combined with magnetic powder is rapidly increased, after this kind of floc flows into the sedimentation tank, rapid settlement can be achieved within a few minutes, and the sedimentation rate can reach 40 meters per hour, which is 20 times that of conventional coagulation and precipitation. The adsorption and catching ability has been further improved, the treatment effect has been strengthened, and the magnetic coagulation and sedimentation system has been perfectly upgraded.


Application Field:

  1. Municipal sewage treatment
  2. Treatment of black and odorous water bodies
  3. Industrial wastewater treatment
  4. River management

Major Function:

  1. ​The total phosphorus was removed by dosing

  2. Turbidity removal

  3. Removal of total suspended solids

  4. Removal of E. coli


Project Cases:

Project name Treatment of Longjin Yangqi Water System in Cangshan, Fuzhou

 Chizhou High tech Zone OverflowPollution Control Project

 Inner Mongolia Ordos Mine Water Fluoride Removal System Renovation Project

 ABS wastewater treatment in the chemicalindustry

      etc

Product Overview

 The overflow pollution control of Longjin Water System Pumping Station in Cangshan District, Fuzhou is highly effective for the water quality fluctuation and black odor phenomenon of the pumping station, and the treatment water volume is 40,000T/D

 Micro-sand loading medium precipitation technology, the effluent of the equipment reaches the "Pollutant Discharge Standard for Urban Sewage Treatment Plants" (GB18918-2002) - grade A, and the treated water volume is 40000T/D

 Project Name: Bojiang Haizi Mine Water Fluoride Removal System Renovation Project, Project Scale: 10000m3/d Fluoride Concentration in Raw Water: F=2.5-6mg/L Effluent Standard: "Surface Water Environmental Quality Standard" (GB3838-2002) Fluoride Ion Limit Requirements in Three Categories of Water, namely: Fluoride ≤1mg/L.

 Project Overview: Mainly remove a large amount of SS in ABS wastewater, treatment water: 10800T/D

 etc
Pictures of the governance site Upgrade Your Sewage Treatment System with Bubble Technology s Advanced Water Treatment Equipment 0 Upgrade Your Sewage Treatment System with Bubble Technology s Advanced Water Treatment Equipment 1 Upgrade Your Sewage Treatment System with Bubble Technology s Advanced Water Treatment Equipment 2 Upgrade Your Sewage Treatment System with Bubble Technology s Advanced Water Treatment Equipment 3  etc

 


Certificate

API-5LD AUTHENTICATION American Petroleum Institute API 5LC Certificate ASME Certificate in the United States EU PED&AD2000 certificate ABS classification society certification certificate in the United States DNV Det Norske Veritas Certificate RINA Italian Bureau of Shipping Certificate BV French Bureau of Shipping certification LR Lloyd's Register Certificate of Approval Customs Union EAC Certificate Russian GOST certificate
Upgrade Your Sewage Treatment System with Bubble Technology s Advanced Water Treatment Equipment 4 Upgrade Your Sewage Treatment System with Bubble Technology s Advanced Water Treatment Equipment 5 Upgrade Your Sewage Treatment System with Bubble Technology s Advanced Water Treatment Equipment 6 Upgrade Your Sewage Treatment System with Bubble Technology s Advanced Water Treatment Equipment 7 Upgrade Your Sewage Treatment System with Bubble Technology s Advanced Water Treatment Equipment 8 Upgrade Your Sewage Treatment System with Bubble Technology s Advanced Water Treatment Equipment 9 Upgrade Your Sewage Treatment System with Bubble Technology s Advanced Water Treatment Equipment 10 Upgrade Your Sewage Treatment System with Bubble Technology s Advanced Water Treatment Equipment 11 Upgrade Your Sewage Treatment System with Bubble Technology s Advanced Water Treatment Equipment 12 Upgrade Your Sewage Treatment System with Bubble Technology s Advanced Water Treatment Equipment 13 Upgrade Your Sewage Treatment System with Bubble Technology s Advanced Water Treatment Equipment 14

 


Packing and Shipping:

This peoduct is carefully packaged to ensure its safe delivery to you. It is wrapped in protective packaging material to prevent any scratches or damage during transit.

For shipping, we use trusted delivery services to make sure your product arrives promptly and in excellent condition. You can track your order to know exactly when it will reach you.
 


Global Support:

Thank you for your interest in our products and look forward to being your reliable global partner. For product catalogs, quotations or custom needs, please feel free to contact the international sales team and we will respond to your needs within 24 hours!